当前位置首页 > 高等教育 > 习题/试题
搜柄,搜必应! 快速导航 | 使用教程  [会员中心]

太阳能热水器使用说明中译英1111-修改

文档格式:DOC| 13 页|大小 1.39MB|积分 10|2022-07-14 发布|文档ID:119403332
第1页
下载文档到电脑,查找使用更方便 还剩页未读,继续阅读>>
1 / 13
此文档下载收益归作者所有 下载文档
  • 版权提示
  • 文本预览
  • 常见问题
  • Kerste 太阳能 Solar Energy 太阳能热水器Solar Water Heater Product Structure 1. Water tank shell 2. Thermal barrier 3. Inner tank 4. Upper exhaust cap 5. Seal ring 6. Outer tank end cover7. Scraper seal 8. Multifunctional upgraded reserved hole (Mg bar mounting hole) 9. Vacuum heat collector 10. Water inlet and outlet 11. Tube support 12. Holder 13. Tank support Operation Instruction 1. The product shall be handled with care during transportation and installation. 2. It’s forbidden to block up the air exhaust opening! Tee shall be mounted with the upper interface for air exhaust and lower interface for overflow, it’s not allowed to directly connect to any other tube! Otherwise, the water tank may be swollen or shrunk due to poor air exhaust.3. After connecting the tank support and lacing wire with front and back holder, the water tank shall be placed on holder, pay attention that evacuated tube hole of water tank shall be directed at holder bottom support box, and ABS plastic holder shall be mounted into bottom support box hole, then put the four screws at the bottom of tank,don’t fasten them at first, mount the decorative rubber ring with water onto evacuated tube, soapsuds shall be coated at the seal outside of evacuated tube as lubricant, and the evacuated tube with water shall be inserted into water tank hole (twist it). After the evacuated tube if fully inserted, the water tank angle shall be adjusted a little. Then fasten the screws firmly at the bottom of tank and insert the evacuated tube insert back to the relevant ABS holder (twist it).4. When connecting water feed tube and drain tube, it’s best to choose special composited tube or cross-linked tube so as to reduce watermark and heat loss, the heat of tube shall be preserved with heat insulating material, which can be used together with cable during charged heating. Fix the water feed tube and drain tube on holder or building. In cold area, drain valve shall be added to drain water in water feed tube and drain tube. 5. The temperature inside of evacuated tube can reach above 250℃in the sun in the open air, pay more attention that cooling water fed may crack the evacuated tube! See following methods to avoid such phenomenon:A. Fill the evacuated tube with water and feed water after it’s fully inserted; B. Conceal the evacuated tube for 3 hours and feed water after the temperature in tube drops. Installation of Solar Water Heater System 1. Parallel Connection Top waterRegulating valve Hot waterIt’s suitable for situation in need of large quantity of hot water and flow. 2. Series Connection Top water Hot water It’s suitable for situation of high requirement for water temperature but smaller quantity of hot water compared to parallel connection. Holder Installation 1. Installation of front holder: use bolt to connect the front holder, right frame and upper and lower reflector panel; use bolt to fix the tube support to the connecting hole of left and right frame of front holder, don’t fasten the upper nut at first for further convenient adjustment.2. Installation of back holder: use bolt to connect back holder, right frame and back holder batter brace, then fix the midpoint of batter brace, adjust it angle and fasten the screw.Fix the tube support to the connecting hole of left and right frame of front holder, don’t fasten the upper nut at first for further convenient adjustment. Solar Installation Schematic Diagram Flat Roof Installation Method Description Please refer to above installation schematic diagram for manual water feeding, it only needs to open ball valve 1 and 2 to feed water, when opening ball valve 1 and closing ball valve 2, it’s available for bath at once after adjusting hot water. Exhaust pipe Overflow tube Water feed tube and drain tube Water tankElectric heating device Evacuated tube Roof Ball valve 1 One-way valve Ball valve 2 Hot water tap Top water Villa Installation Method Description It’s not allowed to install valve at upper or lower part of air exhaust opening and overflow port so as to avoid jam of exhaust opening. Reserved opening is set up for automatic control device, it can be plugged up to reduce heat dissipation when control device is not mounted. Reserved opening Exhaust and overflow port Upper circulating tube Drain valve Hot water Top water Heat collector Lower circulating tube Please feel the water temperature with hand during bath so as to prevent the skin from scald! Installation Structure Diagram Pitched Roof Installation Structure Diagram Straddle type tank support Windproof foot pad Pitch General Fault & Settlement FaultWater is not hot in summer.Water tank is not fullWater tank is leakingWater is sometimes hot and sometimes coldThere’s no hot water in winterReason1. There’s obstruction or air, smoke dust and severe pollution at the upper part of heater.2. As the water feeding valve doesn’t close tightly, the hot water in water tank is edged out by tap water (cold water).1. The hydraulic pressure of tap water is not enough. 2. The water feeding tube is leaking. 3. The water tank is leaking. 1. The seal ring is damaged or the water tank is not properly mounted. 2. The inner tank cracks.The hydraulic pressure of tap water is unstable.1. The water feed tube drain tube and are frozen in cold winter. 2. It’s too cold. 3. The pipe doesn’t preserve heat.Settlement1. Remove the obstruction or choose a new place for installation.2. Change the water feeding valve.1. Add a mini water pump.2. Change the water feeding valve.3. Change the water tank.1. Change the seal ring or adjust the water tank position. 2. Change the water tank.Add an auxiliary water tank on the roof, it can either store cold water or regulate the voltage, exchange the cold water, or automatic thermostatic valve shall be used.1. The agency or manufacturer may help to preserve temperature (cost price).2. Use up the hot water and exhaust the water in tank at night, and feed water on the next morning.3. Open the water heating valve to let the hot water drop slowly at night in the coldest days for freeze-proofing.真空管规格 Evacuated tube spec.水箱内胆 Inner tank 进口SUS2B-304食品级不锈钢 Import SUS2B-304 food grade stainless steel保温材料 Heat insulating material进口聚氨酯 Import PUR系统承压 System withstand pressure 出厂试压0.2MPa, 常压运营 Factory test pressure 0.2MPa, normal pressure operation水箱外壳 Water tank shell烤瓷抗腐珠光板Ceramic anti-corrosion pearl- acrylic支架材料 Holder material 镀锌板烤漆Galvanized sheet with baking finish支架颜色 Holder colour 红 Red 支架倾角 Holder angle 角度38°/45° 38°/ 45°真空管类型 Evacuated tube type高效管/三高管/高频速热管 High efficiency tube/ Three-high tube/high frequency quick heating tube 管数范畴 Number of tubes 16、18、20、24、30、36 16, 18, 20, 24, 30, 36真空管规格 Evacuated tube spec.水箱内胆Inner container 进口SUS2B-304食品级不锈钢 Import SUS2B-304 food grade stainless steel 保温材料 Heat insulating material进口聚氨酯 Import PUR系统承压 System withstand pressure 出厂试压0.2MPa, 常压运营 Factory test pressure 0.2MPa, normal pressure operation水箱外壳 Water tank shell烤瓷抗腐珠光板Ceramic anti-corrosion pearl- acrylic支架材料 Holder material 镀锌板烤漆Galvanized sheet with baking finish支架颜色 Holder colour 红 Red 支架倾角 Holder angle角度38°/45° 38°/45°真空管类型 Evacuated tube type高效管/三高管/高频速热管 High efficiency tube/ Three-high tube/high frequency quick heating tube 管数范畴 Number of tubes 16、18、20、24、30、36 16, 18, 20, 24, 30, 36 真空管规格 Evacuated tube spec.水箱内胆 Inner container 进口SUS2B-304食品级不锈钢 Import SUS2B-304 food grade stainless steel 保温材料 Heat insulating material进口聚氨酯 Import PUR系统承压 System withstand pressure 出厂试压0.2MPa, 常压运营 Factory test pressure 0.2MPa, normal pressure operation水箱外壳 Water tank shell烤瓷抗腐珠光板Ceramic anti-corrosion pearl- acrylic支架材料 Holder material 镀锌板烤漆Galvanized sheet with baking finish支架颜色 Holder colour 红 Red 支架倾角 Holder angle 角度38°/45° 38°/45°真空管类型 Evacuated tube type高效管/三高管/高频速热管 High efficiency tube/ Three-high tube/high frequency quick heating tube 管数范畴 Number of tubes 16、18、20、24、30、36 16, 18, 20, 24, 30, 36 真空管规格 Evacuated tube spec.水箱内胆 Inner container 进口SUS2B-304食品级不锈钢 Import SUS2B-304 food grade stainless steel 保温材料 Heat insulating material进口聚氨酯 Import PUR系统承压 System withstand pressure 出厂试压0.2MPa, 常压运营 Factory test pressure 0.2MPa, normal pressure operation水箱外壳 Water tank shell烤瓷抗腐珠光板Ceramic anti-corrosion pearl- acrylic支架材料 Holder material 铝合金复合板材Al alloy composite board 支架颜色 Holder colour 银/红色 Silver/Red 支架倾角 Holder angle 角度38°/45° 38°/45°真空管类型 Evacuated tube type高效管/三高管/高频速热管 High efficiency tube/ Three-high tube/high frequency quick heating tube 管数范畴 Number of tubes 16、18、20、24、30、36 16, 18, 20, 24, 30, 36 真空管规格 Evacuated tube spec.水箱内胆 Inner container 进口SUS2B-304食品级不锈钢 Import SUS2B-304 food grade stainless steel 保温材料 Heat insulating material进口聚氨酯 Import PUR系统承压 System withstand pressure 出厂试压0.2MPa, 常压运营 Factory test pressure 0.2MPa, normal pressure operation水箱外壳 Water tank shell中国红珠光板 Chinese red pearl- acrylic支架材料 Holder material 镀锌板烤漆Galvanized sheet with baking finish支架颜色 Holder colour 红 Red 支架倾角 Holder angle 角度38°/45° 38°/45°真空管类型 Evacuated tube type高效管/三高管/高频速热管 High efficiency tube/ Three-high tube/high frequency quick heating tube 管数范畴 Number of tubes 16、18、20、24、30、36 16, 18, 20, 24, 30, 36。

    点击阅读更多内容
    卖家[上传人]:积水成渊
    资质:实名认证